Interior framing

by threedogsandahouse

After the plywood was laid down as the first layer of roofing over the entire house, interior framing continued, to prepare for rough plumbing and HVAC ductwork to begin.

A temporary stairway to the attic was built, and now I can safely climb up there to check out the progress.

And in the attic, there is the beginning of a fantastic play space.

Advertisements